(article in draft)
This is designed to give a description of the basis events that may add to good management of insolvency workflows.
Adding Job |
Adding jobs may be a roe for a centralised resource. This can be managed |
Determining Access Permissions |
One of the first task to is to set the job permissions. This is best done be assigning a work team. The advantages of using work teams are: 1. You can manage permissions at the practice level and more easily visualise which rights are granted to users. See resources on <Setting up permissions>. |
Import Checklist Templates |
Templates are not automatically added to jobs. It is important for compliance to ensure the correct templates are added and tasks are assigned and monitored. <assistance on tasks> |
Assign Users to Tasks |
Once of the next steps is to hold an initial task review and assign responsibility to users for completing tasks. |
Document Production |
The task check lists will have pointers to the documents you need to add. |
Specific operational assistance |
Here are some specific points on how to use the system for: Communicating with Creditors |
Specific Compliance Monitoring |
Particular tasks groups can be set up as statutory tasks. There needs t be a co-ordinated process of monitoring compliance both for the user assigned to the task level and the management and review of the tasks. See <help on how to monitor tasks> |
- Statutory Returns |
Specific procedures and monitoring should be implemented on statutory return preparation. <link to resources> |
- BAS Returns |
Specific procedures and monitoring should be implemented on BAS lodgement. <link to resources> |
- Employees |
Specific procedures and monitoring should be implemented for employees. <link to resources> |
Finalisation Procedures |
Comments
0 comments
Please sign in to leave a comment.